


| Client | : | General Directorate of Iller Bank |
|---|---|---|
| Construction Year | : | 1998-2006 |
| Location | : | Ereğli / Konya |
| Scope of Work | : | Sewerage Network, Collector Lines, Manholes, Parcel Connections and Manholes, Partial Stormwater Channels. |
| Annual Concrete Pipe Production | : | 50.000 mt. (Ø150-1200 mm.) |